FCA’s new assembly plant on Detroit’s east side marks yet another milestone. As steel continues to be raised for the new paint shop, the first piece of equipment has been installed, a 120-ft. E-coat dip tank that had to be delivered in six separate sections. Weighing about 30,000 lbs. or nearly 17 tons each, the
Read More